None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#1268 Manual run by Graham Mann

#1269 Manual run by Graham Mann

1 build

26 minutes

  • Average time to fix a failure: 26 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 26 minutes, from failure starting in build #1268.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #1268.